As aSurvey Party Chief on the $3.3BN Hampton Roads Bridge Tunnel Expansion Project (HRBT) in Virginia, you willbe responsible for leading a crew thatjointlyperforms field layoutsand as-built surveysfor construction purposes.
The Hampton Roads Connector PartnersJV(HRCP) consisting of Flatiron, Dragados USA and VINCI,hasbeen selectedto construct the $3.3BN Design Buildproject-the largestcivilconstruction contracteverawarded by the Virginia Department of Transportation (VDOT).
The project scopeacross a 9 mile section of the I-64will include:a new 3.5-mile bridge-tunnel crossing that will accommodate a total of 8 lanes of capacity across the water, replacement of the existing marine approach bridges and the addition of a third lane on I-64 in each direction.The twin 45' diameter 1.5-mile tunnelswill be boredby TBM, creating the second largest TBM tunnel opening for a TBM in North America.The projectis expectedto continue to the end of 2025.
Responsibilities:
Subscribe to job alerts and upload your resume!
*By registering with our site, you agree to our
Terms and Privacy Policy.